Positions of permanent ground markers on baseball field.
Close-up view of LP permanent athletic field ground markers.
Step1 : Using the pipe tool provided, start a pilot hole.
Dig hole atleast 7 inches deep with the pilot hole tool.
Remove pilot tool and insert the ground socket in its place.
Install the marker push-down tool in the cavity of the socket.
Using a hammer or a rubber mallet push the marker down.
View of the ground marker socket pushed flush to the ground.
Once marker is flush to the ground remove the push tool.
Install caps on the top of the cavity of the LP ground markers.
Caps for the LP ground sockets are available in several colors.
When painting lines, remove the cap and install the lining peg.
Lining peg used to install string from one marker to another.
Loop the string around the knob on top of the lining peg.
Pull the string tight from one soccer ground socket to another.
Use the string as a guide to paint straight lines everytime.
Stripe straight bright lines with USSC paint, machines, markers.